DART Rail Construction Alerts - Archives
Level Boarding ConstructionProject Moves to Outlying Rail Stations
Most Work to Take Place on Weekends Over 14 Month Period (June 2009 - August 2010)
• Level Boarding Project continues at LBJ/Skillman Station Saturday, July 11 & Sunday, July 12 and begins at Tyler/Vernon Station, Saturday, July 18 & Sunday, July 19
|
||||||
July 10, 2009
Select a location below to view DART construction activity in that areaGreen Line Updates:
Downtown Dallas construction information
|
Downtown Dallas: • To support construction around the Bryan/Hawkins intersection: • Motorists will not be able to make left turns from Leonard St. across the DART Rail tracks. View a street location map. |
Market Center Community construction information
|
Market Center Community: • Three northbound lanes on Harry Hines between Wycliff and Market Center are open. View a street location map. • Three southbound lanes on Harry Hines between Market Center and Wycliff are open. At the Wycliff intersection, median work is scheduled and lanes will continue be reduced to two southbound lanes through the intersection. View a street location map. • Two northbound lanes on Harry Hines between Wycliff and Throckmorton are now open. View a street location map. • The intersection of Vagas and Harry Hines has been reopened. View a street location map. |
||
|
Love Field West Community construction information
|
Love Field West Community: Neighborhood Construction Advisory - West of Love Field Construction on DART's exciting Green Line expansion into Northwest Dallas, Farmers Branch and Carrollton has begun in earnest and will continue until passenger service officially begins in December 2010. Listed below is a brief outline of how some of the major streets in the neighborhood west of Love Field will be affected.
Construction for DART's new Green Line will require the temporary closure of four streets at the railroad crossing near Denton Drive, beginning on or around Monday, May. 25. The closures will involve two streets at a time with each lasting approximately one week. Anson and Gilford were the first streets closed. To reach Anson, traffic from Denton will be detoured to south to Empire Central, then north on Little Denton to Anson. To get to Gilford, vehicles will be detoured north to Burbank and south on Little Denton to Gilford. • Anson has been re-opened. Upon the completion and re-opening of Anson and Gilford, work will begin on Burbank and Empire Central, and the detours will be reversed. Gilford and Little Denton will be used to reach Burbank, Anson and Little Denton to reach Empire Central. The Green Line is scheduled to begin passenger service between Dallas, Farmers Branch and Carrollton in December 2010. Future notifications will be provided as the construction work progresses throughout the project. For more information, call 214-749-2522. For emergency only, call DART Police at 214-928-6262. • Traffic is reduced to one lane each way at W. Mockingbird Lane and Denton Drive. View a street location map. • There is a traffic switch on Denton Dr. from north of Hawes Ave. to Lovedale for paving work. The northbound lanes are closed and traffic is detoured onto the southbound lanes with one lane open in each direction. Once the northbound lanes are completed, traffic will be switched to the new lanes while southbound lanes are paved. View a street location map. • Denton is closed from Shorecrest to Webb Chapel for underground utility and bridge work until further notice. Detour is available via Harry Hines. View a street location map. • From Monday, July 6 for approximately one week, Community Drive at the rail guideway will be closed. View a street location map. |
||
|
Walnut Hill/Denton Area construction information
|
Walnut Hill/Denton Area: Construction for DART's exciting Green Line Expansion Program into Northwest Dallas, Farmers Branch and Carrollton, is underway and will continue until the new passenger service begins in December 2010. Construction in this area will necessitate occasional traffic shifts and detours as some of the local streets and infrastructure are improved. • Webb Chapel Extension and Denton Drive is reduced to one lane in each direction for the installation of underground utilities until further notice. View a street location map. • Denton Drive is closed from Storey Lane to Webb Chapel until further notice. View a street location map. • Denton Drive between Willowbrook and Lombardy is reduced to one lane southbound. View a street location map. • Denton Drive between Lombardy and Walnut Hill will be closed except for local traffic. Motorists are encouraged to look for local road detour signage. View a street location map. • Century Drive between Doric Street and Denton Drive will permanently close. Local business traffic wishing to access Denton Drive from the east will need to detour along Doric Street to Abernathy Avenue and Lombardy Lane. This work will be followed by subsequent traffic shifts at this location--each lasting for several weeks--to allow for the reconstruction of Century Drive with a direct connection to Abernathy Lane. Road construction on Century Drive is anticipated to continue until Fall 2009. • Walnut Hill near Denton Drive may have daily lane closures. View a street location map. • There is an altered lane configuration on Denton, north of Forest Lane, to accommodate the next phase of paving. View a street location map. |
||
|
Farmers Branch Community construction information
|
Farmers Branch Community: Farmers Branch On-Call Boarding With Other DART Routes at Farmers Branch Park & Ride - Effective October 20, 2008 All Farmers Branch On-Call vehicles drop off and board passengers at the temporary transit center on Denton Drive. This is the location currently being used by Bus Routes 44, 185, 204, 247, 331, 400 and 486. Boarding will take place at the sign marked: DEPARTURES All Bus Routes All DART services will use this stop until the new Green Line rail station opens across the street in December 2010. Riders may continue to call 972-880-7786 to schedule an On-Call trip reservation. For other questions about On-Call service, please consult www.DART.org or call 214-979-1111. View a street location map. • Villa Creek near Denton Drive may have daily lane closures. View a street location map. • Farmers Branch Lane at Denton is closed for utility installation. View a street location map. • Beginning Monday, July 27 through approximately the end of October, Denton Drive at Farmers Branch Lane will be closed for the reconstruction of the Rawhide Creek vehicular bridge. Detour signage will be available to guide motorists. View a street location map. • Various lanes are altered on Valley View Lane at Denton as concrete is placed in the median for a brick paver base. View a street location map. • Buttonwood Drive is closed until further notice. View a street location map. • Pike Street is closed until further notice. View a street location map. • Squire Place at Denton Drive is closed until further notice. View a street location map. • McClintock is closed between Squire Place and Fruitland for utility work until further notice. View a street location map. |
||
|
Carrollton Community construction information
|
Carrollton Community: Construction for DART's exciting Green Line Expansion Program into Northwest Dallas, Farmers Branch and Carrollton, is under way and will continue until the new passenger service begins in December 2010. Construction in this area will necessitate occasional traffic shifts and detours as some of the local streets and infrastructure are improved. • On Valwood Parkway at the rail guideway, traffic has been switched to the outside lanes while median paving work is done. View a street location map. |
||
|
Deep Ellum Community construction information
|
Deep Ellum Community: • Malcolm X Blvd. between Junius and Indiana may be periodically reduced to one lane in each direction until further notice. View a street location map. • There will be a traffic switch on Hall Street at the rail guideway to the new paving on the northbound lanes until future notice. View a street location map. |
||
|
Fair Park Community construction information
|
Fair Park Community: • Beginning Monday, July 6 at 7 p.m., lanes on Parry and R. B. Cullum (SH 352) will be closed during an operation to perform street and track adjustments, located at southbound SH 352 adjacent to Fair Park. Work will begin in the left lane of southbound SH 352 at the track crossing. The contractor will be moving from left to the right along the tracks. Work will continue until 5 a.m. when lanes will be re-opened to the traveling public. This work will continue during these same hours nightly through July 15 except for Friday, July 10 and Saturday, July 11. Working hours between 7 p.m. and 5 a.m. will continue on Sunday, July 12 through Wednesday, July 15. Southbound Parry will be closed at First due to work on the southbound left lane of SH 352. Traffic will be detoured to the west on First to Ash. Detoured traffic will continue on Ash to Second. From there, detoured traffic will head southeast on Second and transition via two lanes (center and right) into southbound SH 352. The contractor will have the left inside lane closed on southbound SH 352 and two lanes of traffic will remain open on southbound SH 352 at all times. View a street location map. • Parry Ave. at Haskell will be reduced to one lane in both directions until further notice. View a street location map. • Trunk Ave. between Pennsylvania and Birmingham is closed until further notice. View a street location map. |
||
|
Hatcher Community construction information
|
Hatcher Community: • Eastbound traffic along Scyene Rd. between 2nd Ave. and Hatcher St. and westbound traffic along Scyene Rd. between Hatcher St. and Lawnview Ave. may have periodic lane reductions. View a street location map. • Traffic along Hatcher St. at Scyene Road will be reduced to one lane in each direction. There will be daily lane closures at the intersection of Scyene Road and Hatcher St. View a street location map. • Traffic has been switched to the newly paved lanes on Hatcher at Scyene. One lane in each direction is open. View a street location map. • Dixon Avenue near Scyene Road has one lane open in each direction. View a street location map. • Left turn lane on Lawnview Avenue at Scyene Road is detoured. Motorists are encouraged to look for detour signage. View a street location map. • Westbound traffic along Scyene Road to Lawnview Avenue will be detoured to Elmira Street (right) to Greenmere Place (left) and back onto Scyene (right). View a street location map. |
||
|
Lake June Community construction information
|
Lake June Community: • There may be temporary lane reductions on Buckner Blvd. between Elam Rd. and US 175. View a street location map. • There is one lane open in each direction on Elam Road between Hillburn Drive and Buckner until further notice. View a street location map. • From 6 p.m. on Friday, July 10 through 5 a.m. on Monday, July 13, Elam at the rail guideway will be closed. Westbound Elam will be closed at Buckner. Detour will be the C.F. Hawn Fwy. service road. Eastbound Elam will be closed at Hillburn. Detour will be Hillburn to Rosemont, then Buckner back to Elam. View a street location map. |
||
|
Orange Line Updates:
Orange Line construction information
Week of July 13 Road closures and lane restrictions:
Week of July 20 Road closures and lane restrictions:
• In the Harry Hines/Jameson/Northwest Hwy. area, construction activities will include drill shaft operations, column operations, electrical work, walls and grading for bridge construction preparation. There will trucks and equipment moving in and out of the construction site, so please use caution in this area with the increased activity. Jameson at the Northwest Hwy. frontage road will be closed until further notice. View a street location map. • The right lane of southbound Harry Hines under Northwest Highway will be closed until further notice. Two southbound lanes will be open for through traffic. View a street location map. |

Any time you undertake a construction project, the possibility for danger is elevated. DART is urging everyone to be extra careful around its facilities, vehicles and especially the construction areas. Here are 10 tips you should know.
- Stop, look and listen for DART vehicles.
- Cross the street or track at designated crosswalks only.
- Never walk, ride or play in front of or behind a DART vehicle.
- Children should always exit the bus through the front door.
- Do not walk, ride or play in a construction area.
- Never walk, ride or play on or near railroad tracks.
- Always stand behind the textured warning strips on rail platforms.
- Be careful when driving or turning across train tracks.
- Never try to beat a train through a crossing.
- Remember: Safety begins with you. Talk to your family.

hideshow



















Where To Buy Fares & Passes
Ride DART, Save Money. Commute Calculator
Find Us On Facebook
Follow Us On Twitter