August 26, 2008

Select a location below to view DART construction activity in that area

Downtown Dallas construction information


Downtown Dallas:

Live Oak Exit Closure
Effective Sunday, June 17, 2007

The Live Oak exit on southbound US 75 (Exit 284C) will be closed starting Sunday night, June 17 and remain closed until June 2009. The closure is part of DART's Green Line Rail construction around the Bryan/Hawkins intersection. Two bridges in the area have been removed and the road is being lowered to street level.

Motorists who typically take the Live Oak exit are advised to either exit at Lemmon or take the Ross exit and travel to Pearl St. View a street location map.

To support construction around the Bryan/Hawkins intersection:
Bryan is closed between Leonard and Good Latimer. View a street location map.
Good Latimer is reduced to one lane in each direction between Bryan and Elm.
View a street location map.


Motorists will not be able to make left turns from Leonard St. across the DART Rail tracks.
View a street location map.

Downtown Dallas Level Boarding Construction Information View more information
about Downtown Dallas
Level Boarding Construction

West End Station Temporarily Relocating From Sept. 12 (8 p.m.) to Oct. 20


• Akard Station Northbound Platform Out of Service Saturday, August 30 and Sunday, August 31

Additional renovation at Akard Station will require the closing of the northbound platform on Saturday, August 30, and Sunday, August 31.

Red and Blue line trains to Parker Road and Downtown Garland will be unable to board or discharge passengers at Akard on that weekend only, but will continue to serve West End and St. Paul stations. Southbound service to Westmoreland and Ledbetter will be unaffected.

There will be no bus shuttles in operation between stations on those days.

Modifications for the southbound platform will be scheduled at a later date.

We apologize for the temporary inconvenience. Thanks for riding DART.

Market Center Community construction information


Market Center Community:

Southbound Harry Hines between Market Center and Vagas is reduced to one lane and northbound Harry Hines between Knight and Lucas is reduced to one lane until approximately October 1. View a street location map.

Harry Hines Blvd. between Vagas St. and Oak Lawn Ave. is reduced to one lane in each direction until further notice. View a street location map.

Kendall Drive is closed for waste water line installation and traffic will be rerouted to Production Drive. View a street location map.

Detail of Green Line Northwest Corridor Map
Detail of Green Line Northwest Corridor
View a printer-friendly PDF of the complete map in a new window
Love Field West Community construction information


Love Field West Community:

Neighborhood Construction Advisory - West of Love Field
Construction on DART's exciting Green Line expansion into Northwest Dallas, Farmers Branch and Carrollton has begun in earnest and will continue until passenger service officially begins in December 2010. Listed below is a brief outline of how some of the major streets in the neighborhood west of Love Field will be affected.

Denton Drive @ Mockingbird Lane
Motorists should expect periodic lane reduction on both streets as various construction stages proceed during the project.


Gilford Avenue
Gilford Avenue will be temporarily closed between Denton Drive and just west of Little Denton for reconstruction. This will include temporarily closing off access to this street from Little Denton and Denton Drive. During the closure, traffic will be detoured along other streets to reach Denton Drive. View a street location map.


Wyman Street @ Denton Drive
Wyman is currently being accessed via a new bus lane from Burbank and is under construction at the access from Denton Drive. View a street location map.


Manor Way at Denton Drive is closed until further notice. View a street location map.

Traffic is reduced to one lane each way at W. Mockingbird Lane and Denton Drive. View a street location map.

 Harry Hines Blvd. near Community Drive will have temporary daily lane closures until mid-September to facilitate utility work. View a street location map.

Community Drive is closed until further notice with access available via Northwest Highway and Harry Hines Blvd. View a street location map.

Webb Chapel Extension and Denton Drive is reduced to one lane in each direction for the installation of underground utilities until further notice. View a street location map.

Detail of Green Line Northwest Corridor Map
Detail of Green Line Northwest Corridor
View a printer-friendly PDF of the complete map in a new window
Walnut Hill/Denton Area construction information


Walnut Hill/Denton Area:

Construction for DART's exciting Green Line Expansion Program into Northwest Dallas, Farmers Branch and Carrollton, is underway and will continue until the new passenger service begins in December 2010. Construction in this area will necessitate occasional traffic shifts and detours as some of the local streets and infrastructure are improved.

Denton Drive is closed from Willowbrook to Storey Lane until further notice. Detour is available via Harry Hines Blvd. View a street location map.

Denton Drive between Lombardy and Walnut Hill will be closed except for local traffic. Motorists are encouraged to look for local road detour signage. View a street location map.

  Denton Drive between Storey Lane and Lombardy is reduced to one lane southbound. View a street location map.

 Abernathy will have a periodic one lane closure from Saturday, August 23 to Friday, August 29. A construction flagman will be available to direct traffic through the area. View a street location map.

 Century Drive between Doric Street and Denton Drive will permanently close. Local business traffic wishing to access Denton Drive from the east will need to detour along Doric Street to Abernathy Avenue and Lombardy Lane. This work will be followed by subsequent traffic shifts at this location--each lasting for several weeks--to allow for the reconstruction of Century Drive with a direct connection to Abernathy Lane. Road construction on Century Drive is anticipated to continue until Fall 2009.

Walnut Hill near Denton Drive may have daily lane closures. View a street location map.

Detail of Green Line Northwest Corridor Map
Detail of Green Line Northwest Corridor
View a printer-friendly PDF of the complete map in a new window
Farmers Branch Community construction information


Farmers Branch Community:

Rail Construction at Farmers Branch Park & Ride - Effective August 11, 2008
For All Bus Routes Serving Farmers Branch Park & Ride:
As construction continues on the future Farmers Branch Green Line rail station, all bus activity at Farmers Branch Park & Ride was relocated to a new, temporary location on Monday, August 11.

Routes 44, 185, 204, 247, 331, 400 and 486 will board along Denton Drive at the sign marked:
DEPARTURES
All Bus
Routes

DART On-Call Farmers Branch and DART Paratransit Services will continue to board at their current stops. The Denton Drive location will serve bus passengers until all service moves to the new rail station in December 2010. View a street location map.

Villa Creek near Denton Drive may have daily lane closures. View a street location map.

Valley View Lane is reduced to one lane between Denton Dr. and Rossford St. View a street location map.

Squire Place at Denton Drive is closed until further notice. View a street location map.

McClintock is closed between Squire Place and Fruitland for utility work until further notice. View a street location map.

Detail of Green Line Northwest Corridor Map
Detail of Green Line Northwest Corridor
View a printer-friendly PDF of the complete map in a new window
Carrollton Community construction information


Carrollton Community

Construction for DART's exciting Green Line Expansion Program into Northwest Dallas, Farmers Branch and Carrollton, is under way and will continue until the new passenger service begins in December 2010. Construction in this area will necessitate occasional traffic shifts and detours as some of the local streets and infrastructure are improved.

  Ismaili Center Circle is nearing completion. Construction in this area is anticipated to continue through September 2008. Please see the area map in a new window.

Detail of Green Line Northwest Corridor Map
Detail of Green Line Northwest Corridor
View a printer-friendly PDF of the complete map in a new window
Deep Ellum Community construction information


Deep Ellum Community:

Gaston Ave. at Good Latimer is reduced to one lane in each direction. View a street location map.

Live Oak now has two lanes open in each direction at Good Latimer. View a street location map.

New  Malcolm X Blvd. at the rail guideway will be closed on Tuesday, August 26 from 9 a.m. to 4 p.m. View a street location map.

  Malcolm X Blvd. between Junius and Indiana may be periodically reduced to one lane in each direction through Fall 2008. View a street location map.

Detail of Green Line Southeast Corridor Map
Detail of Green Line Southeast Corridor
View a printer-friendly PDF of the complete map in a new window
Fair Park Community construction information


Fair Park Community:

Two left lanes are closed eastbound Haskell to Parry. View a street location map.

First Ave. at Parry is open both directions eastbound. First Ave. east of Parry will normally flow as one way east (into Fair Park). View a street location map.

There is a traffic switch along northbound R.B. Cullum Blvd. and Parry Ave. from Grand Ave. to First Ave. View a street location map.

 Westbound lanes on Grand Ave. are closed. Traffic is switched to the eastbound lanes. View a street location map.

 From Monday, August 18 to Wednesday, September 3, eastbound Grand Ave. will be closed at the intersection of Trunk Ave. Detour is from Grand Ave. to Meyers St., then Oak Lane to Trunk Ave. View a street location map.

Trunk Avenue northbound, between Grand Ave. and John's Cars is closed to thru traffic. View a street location map.

Trunk is closed between Pennsylvania Ave. and Birmingham Ave. View a street location map.

Trunk is open between Birmingham Ave. and Hamilton Ave. View a street location map.


Detail of Green Line Southeast Corridor Map
Detail of Green Line Southeast Corridor
View a printer-friendly PDF of the complete map in a new window
Hatcher Community construction information


Hatcher Community:

  Eastbound traffic along Scyene Rd. between Second Ave. and Hatcher St. and westbound traffic along Scyene Rd. between Hatcher St. and Lawnview Ave. may have periodic lane reductions. View a street location map.

Traffic along Hatcher St. at Scyene Road will be reduced to one lane in each direction. There will be daily lane closures at the intersection of Scyene Road and Hatcher St. View a street location map.

Dixon Avenue near Scyene Road has one lane open in each direction. View a street location map.

  Left turn lane on Lawnview Avenue at Scyene Road is detoured. Motorists are encouraged to look for detour signage. View a street location map.

Westbound traffic along Scyene Road to Lawnview Avenue will be detoured to Elmira Street (right) to Greenmere Place (left) and back onto Scyene (right). View a street location map.

Detail of Green Line Southeast Corridor Map
Detail of Green Line Southeast Corridor
View a printer-friendly PDF of the complete map in a new window
Lake June Community construction information


Lake June Community:

There may be a temporary lane reduction in the westbound outer lane on Lake June Road at Gillette. View a street location map.

On Jim Miller Road between Lake June Road and US 175, the two inner lanes have been reopened and the outer lanes have been closed. Traffic is being detoured to the inside lanes. View a street location map.

Inside lanes on Elam Road between Hillburn Drive and Roland Avenue have been re-opened. Outside lanes are closed to traffic. View a street location map.

 There may be temporary lane reductions on Buckner Blvd. between Elam Rd. and US 175. View a street location map.

Detail of Green Line Southeast Corridor Map
Detail of Green Line Southeast Corridor
View a printer-friendly PDF of the complete map in a new window
Construction Alerts History:
» View current alert
» 2010 Construction Alert Updates
» 2009 Construction Alert Updates
» 2008 Construction Alert Updates

» December 30, 2008
» December 29, 2008
» December 24, 2008
» December 22, 2008
» December 19, 2008
» December 18, 2008
» December 15, 2008
» December 10, 2008
» December 9, 2008
» December 8, 2008
» December 5, 2008
» December 4, 2008
» December 3, 2008
» December 2, 2008
» December 1, 2008
» November 25, 2008
» November 24, 2008
» November 19, 2008
» November 18, 2008
» November 17, 2008
» November 14, 2008
» November 13, 2008
» November 12, 2008
» November 11, 2008
» November 10, 2008
» November 6, 2008
» November 4, 2008
» November 3, 2008
» October 30, 2008
» October 29, 2008
» October 27, 2008
» October 24, 2008
» October 23, 2008
» October 22, 2008
» October 21, 2008
» October 20, 2008
» October 17, 2008
» October 15, 2008
» October 14, 2008
» October 13, 2008
» October 10, 2008
» October 9, 2008
» October 6, 2008
» October 1, 2008
» September 29, 2008
» September 26, 2008
» September 25, 2008
» September 24, 2008
» September 23, 2008
» September 22, 2008
» September 19, 2008
» September 18, 2008
» September 17, 2008
» September 16, 2008
» September 15, 2008
» September 10, 2008
» September 8, 2008
» September 4, 2008
» September 2, 2008
» August 29, 2008
» August 28, 2008
» August 27, 2008
» August 26, 2008
» August 25, 2008
» August 22, 2008
» August 21, 2008
» August 13, 2008
» August 12, 2008
» August 11, 2008
» August 8, 2008
» August 6, 2008
» August 4, 2008
» August 1, 2008
» July 31, 2008
» July 30, 2008
» July 28, 2008
» July 22, 2008
» July 21, 2008
» July 18, 2008
» July 16, 2008
» July 14, 2008
» July 7, 2008
» July 1, 2008
» June 30, 2008
» June 27, 2008
» June 26, 2008
» June 25, 2008
» June 24, 2008
» June 23, 2008
» June 20, 2008
» June 19, 2008
» June 18, 2008
» June 17, 2008
» June 16, 2008
» June 11, 2008
» June 9, 2008
» June 5, 2008
» June 4, 2008
» June 2, 2008
» May 20, 2008
» May 16, 2008
» May 13, 2008
» May 1, 2008
» April 29, 2008
» April 24, 2008
» April 23, 2008
» April 15, 2008
» April 14, 2008
» April 12, 2008
» March 31, 2008
» March 27, 2008
» March 13, 2008
» March 10, 2008
» February 27, 2008
» February 19, 2008
» February 12, 2008
» February 7, 2008
» January 30, 2008
» January 18, 2008
» January 14, 2008
» January 11, 2008
» 2007 Construction Alert Updates
» 2006 Construction Alert Updates

Image of a father and child at a rail station

Any time you undertake a construction project, the possibility for danger is elevated. DART is urging everyone to be extra careful around its facilities, vehicles and especially the construction areas. Here are 10 tips you should know.

  1. Stop, look and listen for DART vehicles.
  2. DART Safely logo
  3. Cross the street or track at designated crosswalks only.
  4. Never walk, ride or play in front of or behind a DART vehicle.
  5. Children should always exit the bus through the front door.
  6. Do not walk, ride or play in a construction area.
  7. Never walk, ride or play on or near railroad tracks.
  8. Always stand behind the textured warning strips on rail platforms.
  9. Be careful when driving or turning across train tracks.
  10. Never try to beat a train through a crossing.
  11. Remember: Safety begins with you. Talk to your family.

Back to Top

hideshow