Skip to Content

DART – Let's Go.

DART Rider Alerts

Click here to register for My DART Updates

Subject: ADA Ramp Removed During Redesign Work At Ledbetter Station, Effective Monday, April 11, 2016
Effective Date: 4/11/2016

ADA Ramp Removed During Redesign Work At Ledbetter Station, Effective Monday, April 11, 2016

Beginning Monday, April 11, 2016, passengers with disabilities can expect changes when accessing the train platform from the parking lot at Ledbetter Station.

As construction continues at the station, the ramp connecting the parking area to the train platforms will be taken out of service and spaces reserved for disabled parking will be temporarily unavailable.

Four temporary spaces will be available in the new passenger load/unload area at the front of the station accessible from Lancaster Road, and will be specifically designated for passengers with disability placards or license plates. Towing will be strictly enforced. Additional parking will be available at Kiest Station.

Once construction is complete - expected in late May - this area will return to its regular passenger load/unload function and the ramp will be opened for use, this time with lowered walls to improve visibility. Normal parking will be re-established.

Current Rider Alerts:

Other Customer Information:


DART Rail Construction Alerts


Back to Top

hideshow