<?xml version="1.0" encoding="iso-8859-1" ?>
   <rss version="2.0">
   <channel>
 	  <title>DART Rail Construction Alert (www.DART.org)</title>
	  <link>http://www.dart.org/about/expansion/construction.asp?zeon=RSS</link>
	  <description>DART Rail Construction Alert</description>
	  <copyright>Copyright 2009 DART. All rights reserved.</copyright>
	  <language>en-us</language>
        <lastBuildDate>Fri, 20 Nov 2009 10:30:00 CST</lastBuildDate>
	  <image>
	  <title>DART Rail Construction Alert (www.DART.org)</title>
	  <url>http://www.dart.org/images/dart_logo_01.gif</url>
	  <link>http://www.dart.org/about/expansion/construction.asp?zeon=RSS</link>
	  </image>
		<item>
  		<title>DART Rail Construction Update (Orange Line) - November 20, 2009, 10 a.m.</title> 
		<link>http://www.dart.org/about/expansion/construction.asp?zeon=rss20nov09b</link> 
		<description>Bridge construction including girder erection will continue for the Harry Hines/I-35E/Trinity River bridge structure from Jamison/Bachman Station to the west side of the levy on the Spur 482 Frontage Rd. The nights of November 20 and 21 (9 p.m. to 5 a.m.), southbound I-35E, westbound Spur 482 and the ramps to westbound Spur 482 are closed. A detour map for the I-35E closure is available on DART.org. During the nights of November 23 and 24, there will be night closures of Harry Hines Blvd. from 9 p.m. to 5 a.m. Visit the DART website for more Orange Line construction information.</description>
		<pubDate>Fri, 20 Nov 2009 10:30:00 CST</pubDate> 
		<guid isPermaLink="true">http://www.dart.org/about/expansion/construction.asp?zeon=rss20nov09b</guid> 
	        </item>
		<item>
  		<title>DART Rail Construction Update (Love Field West) - November 18, 2009, 4:30 p.m.</title> 
		<link>http://www.dart.org/about/expansion/construction.asp?zeon=rss18nov09</link> 
		<description>On Thursday, November 19, Hawes Ave. will be reopened.</description>
		<pubDate>Wed, 18 Nov 2009 16:30:00 CST</pubDate> 
		<guid isPermaLink="true">http://www.dart.org/about/expansion/construction.asp?zeon=rss18nov09</guid> 
	        </item>
		<item>
  		<title>DART Rail Construction Update (Downtown Dallas and Hatcher) - November 16, 2009, 12 p.m.</title> 
		<link>http://www.dart.org/about/expansion/construction.asp?zeon=rss16nov09</link> 
		<description>Downtown Dallas:  Routh Street at San Jacinto has been reopened. Hatcher: From Wednesday, November 18 through approximately Wednesday, November 25, 2nd Ave. at the rail guideway will be closed.</description>
		<pubDate>Mon, 16 Nov 2009 12:00:00 CST</pubDate> 
		<guid isPermaLink="true">http://www.dart.org/about/expansion/construction.asp?zeon=rss16nov09</guid> 
	        </item>
		<item>
  		<title>DART Rail Construction Update (Love Field West) - November 12, 2009, 9 a.m.</title> 
		<link>http://www.dart.org/about/expansion/construction.asp?zeon=rss12nov09</link> 
		<description>Love Field West: Beginning approximately Monday, November 16, Little Denton will be closed between Empire Central and Lovedale.</description>
		<pubDate>Thu, 12 Nov 2009 09:00:00 CST</pubDate> 
		<guid isPermaLink="true">http://www.dart.org/about/expansion/construction.asp?zeon=rss12nov09</guid> 
	        </item>
		<item>
  		<title>Level Boarding Project Moving to Ledbetter Station on Saturday, Nov. 21 and Sunday, Nov. 22</title> 
		<link>http://www.dart.org/rideralerts/fullrarss.asp?id=652</link> 
		<description>Construction to prepare all remaining DART Rail station platforms for new Super Light Rail Vehicles will continue at Ledbetter Station. Each station closure will take 1-3 weekends.</description>
		<pubDate>Mon, 09 Nov 2009 08:30:00 CST</pubDate> 
		<guid isPermaLink="true">http://www.dart.org/rideralerts/fullrarss.asp?id=652</guid> 
	        </item>	
		<item>
  		<title>DART Rail Construction Update (Love Field West) - November 6, 2009, 4:30 p.m.</title> 
		<link>http://www.dart.org/about/expansion/construction.asp?zeon=rss06nov09b</link> 
		<description>An Update on Improvements Under Way on Little Denton Drive: Work has been planned in phases, with each street closure affecting one block at a time. Sidewalks will remain open during the road construction portion of the project to maximize access for residents. The roadway demolition phases are scheduled to begin on or around the following dates, weather and other circumstances permitting: PHASE 1 - Empire Central to Anson, Nov. 9, 2009; PHASE 2 - Bombay to Langdon, Nov. 30, 2009; PHASE 3 - Langdon to Amherst, Jan. 4, 2010; and PHASE 4 - Amherst to Burbank, Feb. 2, 2010.</description>
		<pubDate>Fri, 06 Nov 2009 16:30:00 CST</pubDate> 
		<guid isPermaLink="true">http://www.dart.org/about/expansion/construction.asp?zeon=rss06nov09b</guid> 
	        </item>
	</channel>
</rss>