Skip to Content

DART – Let's Go.

DART Plus. Building a better experience for you.

DART Construction Alerts

Subscribe to:
Silver Line Project Updates Click here to sign-up for email updates   Click here to sign-up for SMS text updates
D2 Updates Click here to sign-up for email updates   Click here to sign-up for SMS text updates
Transit System Plan Updates Click here to sign-up for email updates   Click here to sign-up for SMS text updates
DART Construction Alerts Click here to sign-up for email updates   Click here to sign-up for SMS text updates
DART Community Meeting/Public Hearing Notices Click here to sign-up for email updates   Click here to sign-up for SMS text updates

June 16, 2020

Bus Stops Relocated as Major Construction Begins at Downtown Garland Station, Effective Friday, June 19, 2020


A construction project, designed to increase accessibility and convenience for Downtown Garland Station customers, begins Friday, June 19, and will temporarily relocate several bus bays.

During the first phase, expected to take 40 days, Bus Routes 377, 380 and 513, plus Paratransit vehicles and Rail Disruption Shuttles, will board and unload at temporary stops on Fifth Street.

For the second phase of construction - routes 378, 402, 463, 486, 566 and 571 will occupy the Fifth Street stops and the routes listed above will return to their original bays. Specific times for this relocation will be announced as they are finalized.

Customers are urged to exercise caution and obey all warning signs in and around work areas. We appreciate your patience as we strive to improve your riding experience.

Hidden Ridge Station Construction to Begin in Late April or Early May


Irving residents and Orange Line passengers can expect construction activity between North Lake College and Irving Convention Center stations in late April or early May, as DART's 65th light rail station begins to take shape.

Contractor Archer Western will conduct preliminary excavation work for Hidden Ridge Station on Meadow Creek Drive near Green Park Drive. Trucks, graders, concrete equipment and excavation equipment will be moving in and out of the area during this phase of construction.

Weather permitting, work will be performed weekdays between 7 a.m. and 5 p.m., with occasional weekend activity if needed. All personnel will adhere to strict CDC guidelines to maximize safety during the current COVID-19 emergency.

Possible lane closures and minor interruptions of Orange Line operation are anticipated.

Upon projected completion in early 2021, the facility will accommodate 136 parking spaces and six bus bays.

Watch this space for updates as they occur.


Construction Alerts History:
» View current alert
» 2020-2021 Construction Alert Updates

» 2019 Construction Alert Updates
» 2016 Construction Alert Updates
» 2015 Construction Alert Updates
» 2014 Construction Alert Updates

Image of a father and child at a rail station

Any time you undertake a construction project, the possibility for danger is elevated. DART is urging everyone to be extra careful around its facilities, vehicles and especially the construction areas. Here are 10 tips you should know.



  1. Stop, look and listen for DART vehicles.
  2. DART Safely logo
  3. Cross the street or track at designated crosswalks only.
  4. Never walk, ride or play in front of or behind a DART vehicle.
  5. Children should always exit the bus through the front door.
  6. Do not walk, ride or play in a construction area.
  7. Never walk, ride or play on or near railroad tracks.
  8. Always stand behind the textured warning strips on rail platforms.
  9. Be careful when driving or turning across train tracks.
  10. Never try to beat a train through a crossing.
  11. Remember: Safety begins with you. Talk to your family.

Back to Top

hideshow