Skip to Content

DART – Let's Go.

DART Rider Alerts

Click here to register for My DART Updates

Subject: Bus Route 60 on Detour During Reconstruction Work on Lindsley Ave., Effective Monday, October 19, 2020
Effective Date: 10/19/2020

Bus Route 60 on Detour During Reconstruction Work on Lindsley Ave., Effective Monday, October 19, 2020

Repaving of Lindsley Ave. between Munger Blvd. and Beacon St. will require a detour of Route 60 to Grand Ave. from Monday, October 19 through mid-November.

Buses outbound to South Garland Transit Center will travel regular route to Munger, then loop over R.L. Thornton service road, Grand and Beacon back to Lindsley. Trips inbound to Downtown Dallas Union Station will exit Lindsley at Graham Ave. to reach Grand and return over the same route. Buses will make no stops along the detour.

The final block between Graham and Beacon will remain open during the initial phase of construction, then will be closed for repaving, requiring a second Route 60 detour sometime in November.

Featured Rider Alerts:


Current Rider Alerts:

Other Customer Information:


DART Rail Construction Alerts


Back to Top

hideshow